Senior medical alert equipment with GPS tracking, SOS alert button and fall detection technology, similar to a life alert monitor designed for elderly safety, family and  caregiver monitoring mobile app.
Kids safety GPS devices connected to a parental control mobile app that allows parents to track location, set safe zones, receive alerts, and manage communication.
family safety seculife wereable pendants for kids sos smart watch for senior happy eldery fall detection
★★★★★ ★★★★★
Trusted by over 29,000+ families
Feature icon

Senior Safety Devices

  • Automatic fall detection & instant alerts
  • Real-time GPS tracking within the app
  • Two-way calling through the device
Feature icon

Kids Safety Devices

  • One-touch SOS with automatic parent alerts
  • Geofence safe zones for school, home, & beyond
  • Approved contacts—unknown callers blocked

OVER 29.000+ ★★★★★ REVIEWS

Trusted by Thousands of Families Across the U.S.

Verified Buyer

Verified Buyer

Verified Buyer

Not Sure Which Wearable Fits Best?

Answer a few quick questions and we'll recommend the best device for you or your loved ones.

Take the 1-min quiz
Wearable devicesWearable devices

Keeping Your Loved Ones Safe Shouldn’t Be Difficult

Step 1

Choose Your Device

Pick the right GPS safety wearable for your loved one.

Step 2

Select a Plan & Activate

Choose a service plan. Your device arrives ready to activate with a built-in SIM.

Step 3

Monitor from the App

Download the app, add family contacts, and start receiving live location + safety alerts.

Safety mobile app displaying live GPS tracking map with geofence notifications, SOS alert activation, fall detection alerts, and real time location updates for family safety monitoring.

One App. Complete Family Safety.

GPS tracking, emergency alerts, and safe zone monitoring in the palm of your hand.

  • Live GPS Map

    See exactly where your loved one is, anytime.
  • Instant Fall & SOS Alerts

    SMS + push notification the moment something happens.
  • Geofence Zones

    Know when they arrive at or leave home, school, or appointments.
  • Multi-Caregiver Access

    Add family members so everyone stays informed.

Real Reviews from Amazon Customers

Free Shipping on All Devices

15-Day Money Back Guarantee

Lifetime Device Warranty

Frequently Asked
Questions

How does the subscription plan work? Can I cancel?

The device is a one-time purchase, and the service plan powers the GPS, SOS, safety,
and calling features. Choose an annual plan for the best value or a month-to-month
plan for maximum flexibility. You can cancel your Month-to-Month plan anytime,
and every order is backed by our 15-day money-back guarantee.

Do I strictly need a monthly plan?

Yes. Like a phone, the device needs an active cellular plan to send GPS location, SOS alerts, and calls. Without a plan it can't connect but plans are affordable with no hidden fees.

Does the device work without Wi-Fi?

No Wi-Fi needed. Every device has a built-in SIM and includes cellular data, so GPS, SOS, and calling all work like a cellphone over the nationwide 4G/5G network.

How does fall detection work?

When a fall is detected, the device automatically triggers an emergency alert
without requiring the wearer to press any buttons. It immediately sends an SMS text
message and in-app notification with the user's live GPS location to approved
emergency contacts, then automatically calls each emergency contact in sequence
until someone answers. If available, the wearer can also communicate through the
device to confirm their condition or request assistance.

Can multiple family members monitor from the app?

Yes. Unlimited family members can connect to the free SecuPro app (iOS & Android) and view location plus receive alerts at the same time at no extra cost.

What is the return policy and money-back guarantee?

Every device comes with a 15-day money-back guarantee. If you're not satisfied, return for a full refund. Shipping is free, so there's zero upfront risk.

Peace of Mind Starts Today

One device. Instant alerts. Real-time location. Fast emergency response when it matters.

Prefer to Talk With Us Instead?

Give us a call and we’ll guide you through which device best suit your needs.